MGT 142 - Operations Planning and Control for Supply Chain Management
Semester Hours:3Once a Year
An intensive study of the planning and control systems used by manufacturing companies to manage their supply chains. Methods of planning, scheduling and controlling industrial production processes; demand management and inventory control; and the design of manufacturing planning and control systems. Students design production systems and use them to manage production operations in a computer simulated manufacturing environment.
Prerequisite(s)/Course Notes: MGT 110, BAN 001, and IT 015. BAN 122 suggested as corequisite or prerequisite.