|
Nov 14, 2024
|
|
|
|
MGT 142 - Operations Planning and Control for Supply Chain ManagementSemester Hours: 3 Once a Year
An intensive study of the planning and control systems used by manufacturing companies to manage their supply chains. Methods of planning, scheduling and controlling industrial production processes; demand management and inventory control; and the design of manufacturing planning and control systems. Students design production systems and use them to manage production operations in a computer simulated manufacturing environment.
Prerequisite(s)/Course Notes: MGT 110 , BAN 001 , and IT 015 . BAN 122 suggested as corequisite or prerequisite.
Add to Personal Catalog (opens a new window)
|
|